News Summary
The long-awaited replacement of the Georgia Avenue Bridge has been rescheduled to 2028 due to rising construction costs and ongoing local construction concerns. Initially set to start in 2025, the projected budget has escalated from $56.6 million in 2022 to over $65 million. The existing bridge, built in 1939, is regarded as structurally deficient, prompting urgency in its replacement. The project will incorporate pedestrian-friendly features and plans to maintain traffic flow during construction. Local officials and residents may face a drawn-out construction period amid financial and logistical challenges.
Georgia Avenue Bridge Replacement Pushes Back to 2028 Amid Rising Costs and Local Construction Concerns
The much-anticipated replacement of the Georgia Avenue bridge connecting Augusta and North Augusta has been officially delayed until 2028 due to escalating construction costs and considerations related to ongoing nearby construction projects. Originally slated to commence in 2025, the bridge replacement faces a significant bump in its financial forecast, soaring from an estimated $56.6 million in 2022 to over $65 million.
Not Your Average Fix: The State of the Current Bridge
The existing bridge, built in 1939, has been classified by the Georgia Department of Transportation (GDOT) as “structurally deficient” and in “substandard condition.” Such assessments have made the bridge’s replacement a priority for regulators. Although GDOT emphasizes that the structure remains safe for current traffic, inspections are conducted regularly to monitor its condition.
Cost Increases: A Major Hurdle
The project has encountered a notable financial hurdle with a 15% rise in estimated construction costs. This major leap in budgetary needs stems from several factors, including soaring material prices and an essential utility relocation process that demands additional funding. These challenges have not only pushed back the project timeline but have also raised concerns about the viability of sustaining ongoing construction without proper fiscal planning.
Expanding Horizons: Project Features and Community Impact
The planned replacement project is set to span along 13th Street/Georgia Avenue from Jones Street in Augusta to Center Street in North Augusta. An exciting aspect of this project is the inclusion of pedestrian-friendly features. These will comprise a barrier-separated sidewalk and essential connections to local trails, making it not only a transit artery but also a user-friendly space for pedestrians and cyclists alike.
Keeping the Lanes Open: Traffic Management During Construction
When construction finally kicks off, officials have committed to ensuring that one lane will remain open in each direction to maintain traffic flow. Such planning aims to reduce inconvenience for daily commuters and local residents, highlighting the importance of seamless communication with the community throughout this extended timeline. GDOT has underscored this aspect, stating that efforts will be made to coordinate with nearby residents and address their concerns during the construction.
A Future Timeline: What Lies Ahead
With the new target date set for 2028, local officials and residents are urged to brace themselves for what is expected to be a lengthy and complex construction journey. The rising costs coupled with the necessity for utility adjustments continue to pose challenges, setting the stage for a robust discussion around funding priorities and municipal planning in the near future.
Final Thoughts: A Necessary Transition
As Augusta and North Augusta prepare for the eventual transformation of the Georgia Avenue bridge, the focus now shifts to navigating the current realities of financial increases, future logistics, and the coordination efforts needed within the local community. The drive for modernized infrastructure that meets current design standards remains a pressing issue that highlights the need for agile project management and responsive government planning.
Deeper Dive: News & Info About This Topic
HERE Resources
Additional Resources
- Post and Courier
- Wikipedia: Infrastructure
- WFXG
- Google Search: 13th Street Bridge
- Albany Herald
- Google Scholar: Bridge Replacement Projects
- WRDW
- Encyclopedia Britannica: Bridge Construction
- 13WMAZ
- Google News: Georgia Bridges

Author: STAFF HERE HILTON HEAD
The HERE Hilton Head Staff Writers are a collaborative team of journalists, editors, and local contributors passionate about delivering accurate, timely information to the Hilton Head community. As part of the HEREcity.com Network, which powers over 100 U.S. city sites including HEREcolumbia.com, our staff draws on collective experience in South Carolina journalism to cover everything from business sales and real estate developments to dining deals and community initiatives. Our Expertise and Background Local Roots in Hilton Head Our team includes lifelong Hilton Head residents and SC natives with deep knowledge of the area’s history, economy, and culture. We’ve covered key events like the recent listings of historic homes 0 , Hilton Head’s Gullah heritage and coastal culture 6 , and growth in local education sectors (e.g., Technical College of the Lowcountry programs) 10 . Collective Experience With over 50 combined years in journalism, our staff has backgrounds in print, digital media, and community reporting. We prioritize fact-based stories, drawing from sources like the Hilton Head Chamber of Commerce, city government records, and on-the-ground interviews. Commitment to Quality Every article is a group effort, involving research, editing, and verification to ensure reliability. We adhere to journalistic standards, citing credible sources and...